North Obhur Gulf 400 mm and Larger Pipelines Construction Project – F1015
North Obhur Gulf 400 mm and Larger Pipelines Construction Project – F1015
: Financial value
: Project owner
: Project Executor
: Project address
The project is located in parts of Jeddah city, north of Obhur Gulf, and involves the installation of C-Class DI drinking water pipelines with diameters ranging from 300 mm to 1400 mm, covering a total length of approximately 33 km, along with all associated appurtenances, including chambers, fittings, valves, and flowmeters. The scope also includes the supply, installation, commissioning, and warranty of 23 fully integrated control panels, equipped with RTU units, HMI screens, UPS systems, relays, indicator lights, and full SCADA integration, along with all required measurement instruments and accessories. In addition, the project covers thrust boring works for pipelines with diameters ranging from 300 mm to 1400 mm over a total length of 735 meters, comprehensive electrical works including electrical rooms, weatherproof and anti-corrosion shelters, distribution panels, cables, and grounding systems. The works also encompass connection to existing networks, relocation of service lines, removal of existing septic tanks and sewage manholes followed by backfilling, as well as earthworks, surface restoration, and asphalt works, ensuring the project is executed to the highest standards of quality and engineering precision.